City of Rockwall
 
  Engineering/Public Works  
 


Mission Statement
To Provide quality services to the citizens of Rockwall through our Water, Wastewater, Street and Drainage, and Engineering Departments in a safe, responsive, cost-effective manner, striving always to continuously improve service to our customers while planning for future needs.

Business Hours
Monday – Friday
8:00 a.m. to 5:00 p.m.

Phone:
(972) 771-7746
Fax: (972) 771-7748
Emergencies: (972) 771-7721

Location:
City of Rockwall
385 S. Goliad Street
Rockwall, Texas 75087
(1st floor Engineering Department)


Contacts
City Engineer - Public Works Director
Chuck Todd


Engineer II
Kathleen Lappen


Engineer III
Amy Williams


Public Services Coordinator
Elizabeth Morgan


Water/Waste Water Manager
Rick Sherer


Water Field Supervisor
Curtis McAden


Field Operations Supervisor
Steve Clawson


 


Department Links
Engineering FAQ

City Construction Notes
Landowner's Bill of Rights

Stormwater Quality
City Engineer - Public Works Director
Chuck Todd


Service Request...
Let us know of any potential problems
in your neighboorhood
Submit a service request...

Texas Smartscape website

John Bunker Sands Wetlands Center
Development Permit Application
Fill Material Request
Roadway Impact Fee Schedule
Water & Sanitary Sewer Impact Fee Schedule
Revised Detention Requirements

Rockwall 2010 Water Quality Report
North Central Texas Council Of Governments
Adopted Flood Plain Prevention Ordinance (9/2/2008)

Impact Fee Studies
Visit the Planning Dept webpage for information on the City’s review of roadway and water/sewer impact fees.


Maps
The maps listed in the drop-down menu below will open in a new browser window. Also, please note that some of the maps are large files and make take some time to show up in your browser.

Standards of Design (Full Document)
Standards of Design 2007 Updates
Please be aware this is a very large document (27 Mb). Listed below are the approximate download times.

56k Dial Up.........................49 Minutes

ISDN.....................................24 Minutes

DSL/Cable/T1.......................2 Minutes

Actual download times may differ.

Revised Detention Requirements
Storm Water Management Program

 
         
     

© City of Rockwall, 2012 ♦ 385 South Goliad Street ♦ Rockwall, TX 75087 ♦ (972) 771-7700